TSS

info@tss4u.com

HQ +31 40 235 1702

info@tss4u.com

KOC, 15 solar systems, 7,930-13,420Wp

Kuwait | Solar Power Systems for contractor Larsen & Toubro Hydrocarbon Engineering Ltd.

15 pcs. Solar Power Systems for contractor Larsen & Toubro Hydrocarbon Engineering Ltd. Installed for the KOC new 48” crude transit line from North Kuwait to CMM project.

Application:

RTU, Telecom, Scada, security system, outdoor camera, lighting

System capacity:

Systems ranging from 921 Ah/day @ 24Vdc up to 1645 Ah/day @ 24Vdc

Design features:

Solar arrays ranging from 7,930 Wp up to 13,420 Wp. Battery banks
ranging from 5,184 Ah @ C72 @ 24Vdc up to 9,828 Ah @ C72 @ 24Vdc

KUWAIT project TSS