...

TSS

United Arab Emirates | TSS was contracted by Galfar Engineering & Contracting to build 1 system

For end user GASCO TSS was contracted by Galfar Engineering & Contracting to build 1 system.
Application: Remote Terminal Unit (RTU), telecom and metering
System capacity: 5,194 Ah/d @ 24Vdc

Design features:

Solar array of 50,085 Wp – Battery bank of 42,768 Ah @ C120 @ 24Vdc

GASCO project TSS
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.