...

TSS

United Arab Emirates | Solar Power Systems for contractor Tecnicas Reunidas

151 pcs. Solar Power Systems for contractor Tecnicas Reunidas. Installed for the Adnoc Onshore Bu Hasa integrated field development project.

Application:

RTU, Telecom, WHCP, Chemical Injection package, corrosion inhibitor skid, instrumentation, valves

System capacity: Systems ranging from 578 Ah/day @ 24Vdc up to 1305 Ah/day @ 24Vdc

Design features:

Solar arrays ranging from 5,580 Wp up to 12,400Wp. Battery banks ranging from 3,764 Ah @ C72 @ 24Vdc up to 8,860 Ah @ C72 @ 24Vdc

UAE project TSS
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.